Home / Zeta Power™ / PCB wastewater

Zeta Power™ application · PCB copper wastewater (pilot stage)

PCB copper wastewater: helping your coagulant work within the residence time you have

When tanks are small, flocs have too little time to grow, and fine copper-bearing particles can be carried over the weir. Zeta Power™ electrode rods are installed in the equalization tank to condition particle charge and help your existing PAC and polymer coagulate and settle. It does not replace pH precipitation.

Suitable for

  • PCB manufacturer
  • Copper-bearing wastewater

Zeta Power™ for PCB Wastewater

kV

35 kV DC electrostatic rodsInstalled in the equalization tank

PAC

Works with your coagulantPAC / polymer

Pilot

Pilot stagePilot projects welcome

The problem

Why is effluent copper hard to keep stable?

1

Tank space is limited, so hydraulic retention time (HRT) is short.

2

PAC and polymer have too little time to react, bridge and grow flocs, so flocs stay small and loose and settle slowly.

3

Fine copper-bearing particles are carried over the settling-tank weir, so effluent copper is hard to keep stable.

How it works

Installed in the equalization tank to help flocs grow and settle

  1. The rods are installed in the equalization tank, with no need to rebuild the treatment tanks.
  2. They condition the surface charge of particles in the water (particle charge conditioning), lowering the electrical repulsion between particles.
  3. Your existing PAC and polymer can then coagulate and bridge faster, so flocs grow larger and settle faster, and fewer fine copper-bearing particles are carried over the weir.
  4. Zeta Power™ does not replace pH precipitation; it supports your existing treatment process.

Pilot

Start with a pilot on your wastewater line

1

Review your treatment process, tank residence times and current chemicals.

2

Plan the Zeta Power™ rod installation in the equalization tank.

3

Measure effluent Cu, SS and turbidity (NTU) before and during the pilot.

4

Decide the next step together, based on the measurements.

Pilot stage

Now in pilot testing with PCB manufacturers

Zeta Power™ is installed at Unimicron, and the wastewater trial is in progress. We are not publishing performance figures yet; we will update this page when results are confirmed.

Contact us

Discuss a PCB wastewater pilot

Contact our team in Thailand directly.

6/1 Moo 11, Malaiman Rd., Wang Nam Khiao, Kamphaeng Saen, Nakhon Pathom 73140, Thailand

Zeta contact form (EN)